- Filling of sausage stuffer:
Close the butterfly valve, fill the hopper with raw materials, 5 minutes after turning on the power, open the ball valve, manipulate the foot switch to raise the piston to the highest position, open the butterfly valve, close the ball valve, and press the feed switch to lower it. As the piston descends, the material in the hopper is automatically sucked into the material cylinder, and the butterfly valve is closed at this time to complete the charging.
- Enema machine enema:
Put the casing on the enema tube, step on the foot switch to start discharging the enema, leave the foot pedal to stop the enema.
After filling, press the stop button on the panel to stop the machine.
Precautions for commercial stainless steel hydraulic sausage stuffer:
Maintenance and operation personnel should wear protective gloves when repairing, maintaining, and cleaning, and cut off the power supply.
1. cleaning operation
Cut off the power supply of this equipment and close the control box door to prevent water from entering. Wear work gloves to clean the oil on the surface of the equipment. Ensure that the equipment is clean and hygienic.
2. Maintenance of electrical equipment
a: The electrical components and connection points are overhauled once a month.
b: Each grounding point should be checked once a month.
c: Clean the electrical control cabinet once a week to keep the electrical control cabinet clean and dry.
Safety Tips: The main power supply of the equipment must be cut off when overhauling and maintaining electrical equipment to prevent accidents!
3. Lubrication
The oil cylinder must have enough oil (32# hydraulic oil is generally used). Too little oil will increase the oil temperature and reduce the working pressure. Clean the oil filter frequently. The working pressure is generally adjusted to between 0.8-1.5Mpa (it has been adjusted before leaving the factory).
4. Warning
5. It is strictly forbidden to repair or maintain the equipment during operation to prevent the occurrence of personal or equipment accidents! !
6. When repairing or maintaining the equipment, the main power supply of the equipment must be cut off before operation to prevent accidents!
Vegetable Washing Machine
Electric Potato Peeler Carrot Peeler Machine Commercial Potato Peeler
Sausage Stuffer
High-Precision Automatic Sausage Vacuum Filler Machine
Sausage Stuffer
Commercial Sausage Vacuum Filler Making Machine
Meat Cutter
304 Stainless Steel Meat Cutter Machine QE 500kg/H
Frozen Meat Grinder
Industrial Large Frozen Electric Mincing Grinding Machine JR-300
Frozen Meat Grinder
Commercial Meat Grinder with Bone JR-100
Frozen Meat Grinder
Large Frozen Meat Grinder JR-250
Frozen Meat Grinder
Commercial Frozen Meat Mincing Machine JR-120
Frozen Meat Grinder
Multi-function Large Frozen Meat Grinder JR-130
Waffle Maker
Egg Waffle Machine Pancake Machine FY-6Y
Waffle Maker
French-Style Electric Heating Commercial Waffle Stick Macke FY-119
Waffle Maker
Commercial Electric Pine Tree Machine FY-2208